Architectural High Quality Steel Strand PC Strand
Product Description
Main uses of steel strand
Construction engineering: Prestressed concrete structures (bridges, high-rise floors, sleepers, etc.) are reinforced with tensioned steel strands to enhance the crack resistance of concrete.
Bridge engineering: Cable of cable-stayed bridge, main cable of suspension bridge (such as parallel steel wire bundle PE sheathed steel strand).
Power engineering: overhead conductors (reinforced with galvanized steel strands), ground wires, cable armor.
Geotechnical engineering: slope reinforcement, foundation pit support (such as anchor cables using 1 × 19 structural steel strands).
Other fields: Pre stressing systems for nuclear power plant containment, mooring ropes for port terminals, etc.
Product Parameters
| Material | Q195/Sae1006/Sae1008/Sea1020 |
| Tolerance | ±5% |
| Standard | ASTM/GB |
| Processing services | Cutting/Bending |
| Shipping date | 15-21days |
| Price terms | FOB/CFR/CIF/EXW/ETC |
| Application | Construction |
| Package | Standard Sea-worthy Packing |
| Galvanized steel wire | |||||
| Diameter (mm) | Tolerance (mm) | Tensile Strength No Less Than (MPA) | Torsion Test No less Than (times) | Bend Times No Less Than (times) | Zinc Coating Mass No Less Than (g/m2) |
| 0.45 | +/-0.01 | 1770 | 28 | 5 | 5 |
| 0.5 | +/-0.01 | 1770 | 28 | 5 | 5 |
| 0.6 | +/-0.01 | 1770 | 28 | 9 | 5 |
| 0.7 | +/-0.01 | 1670 | 28 | 7 | 10 |
| 0.8 | +/-0.01 | 1670 | 28 | 13 | 10 |
| 0.9 | +/-0.02 | 1570 | 28 | 11 | 15 |
| 1 | +/-0.02 | 1470 | 27 | 9 | 20 |
| 1.2 | +/-0.02 | 1470 | 27 | 15 | 20 |
| 1.3 | +/-0.02 | 1370 | 27 | 13 | 20 |
| 1.4 | +/-0.02 | 1370 | 27 | 11 | 20 |
| 1.6 | +/-0.03 | 1370 | 27 | 13 | 20 |
| 1.8 | +/-0.03 | 1370 | 27 | 11 | 30 |
| 2 | +/-0.03 | 1270 | 25 | 10 | 30 |
| 2.4 | +/-0.03 | 1270 | 25 | 11 | 30 |
| 2.6 | +/-0.03 | 1270 | 25 | 10 | 35 |
| 2.77 | +/-0.03 | 1270 | 25 | 9 | 35 |
Production Flow Chart

Project Case


Pack And Ship

Certificate





Customer Praise


Plant And Equipment




FAQ
Q1: What is your terms of payment? A: 30% T/T as the upfront deposit, 70% T/T before delivery or LC. We will show you the photos of products and package before you pay the balance.
Q2: What is the terms of delivery?
A: EXW, FOB, CIF, CFR, DDU
Q3: What is the terms of packing?
A: generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers’requirement.
Q4: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7 days after we received your deposit. For production period,it usually takes about 15 days-30 days after receiving the deposit.
Q5:Could you produce according to the samples?
A : Yes, we could customer-made by your samples or technique drawings, we could build
the mold and fixtures.
Q6: How could you guarantee your products?
A: Each piece of products is manufactured by certified workshops, inspected by SORUN piece by piece according to national QA/QC standard. We also could issue the warranty to customer to guarantee the quality.


















